Designing of open-pit mines using new corrected form of the Korobov algorithm
In the open-pit mining method, it is necessary to design the ultimate pit limit before mining to determine issues, such as the amount of minable reserve, the amount of waste removal, the location of surface facilities, and production scheduling. If the obtained profit from the extraction of the pit...
Uloženo v:
| Hlavní autoři: | , , |
|---|---|
| Médium: | Artigo |
| Jazyk: | Inglês |
| Vydáno: |
University of Tehran
2023-06-01
|
| Edice: | International Journal of Mining and Geo-Engineering |
| Témata: | |
| On-line přístup: | https://ijmge.ut.ac.ir/article_89663_5e1a18ab58b26e3c73d043585f7c4d29.pdf |
| Tagy: |
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!
|
