Uncertainty and Sensitivity Analysis of Significant Parameters for Superlarge Diameter Shield Excavation
Excavation of a superlarge diameter tunnel by tunnel boring machine (TBM) is different from that of a shield tunnel with normal dimension, in which the control system of the superlarge TBM is very complicated and difficult to operate. Hence, it is very important to focus on the control and managemen...
Αποθηκεύτηκε σε:
| Κύριοι συγγραφείς: | , , , |
|---|---|
| Μορφή: | Artigo |
| Γλώσσα: | Inglês |
| Έκδοση: |
Wiley
2021-01-01
|
| Σειρά: | Advances in Civil Engineering |
| Διαθέσιμο Online: | http://dx.doi.org/10.1155/2021/8819393 |
| Ετικέτες: |
Δεν υπάρχουν, Καταχωρήστε ετικέτα πρώτοι!
|
