Internal Force Optimization in Completed Stage and Construction Alignment Control of Super Long-Span Extradosed Cable-Stayed Bridge
This paper is based on a super long-span extradosed cable-stayed bridge with a main span of 400 m. In view of the technical challenges of high negative bending moment at the quarter point of the bridge and large deformation during the cantilever assembly process in the non-cable area, a systematic s...
Gorde:
| Egile nagusia: | |
|---|---|
| Formatua: | Artigo |
| Hizkuntza: | Chinês |
| Argitaratua: |
Editorial Office of Journal of China & Foreign Highway
2025-06-01
|
| Saila: | Zhongwai Gonglu |
| Gaiak: | |
| Sarrera elektronikoa: | https://zwgl.csust.edu.cn/zwgl/article/html/202503022?st=article_issue |
| Etiketak: |
Etiketarik gabe, Izan zaitez lehena erregistro honi etiketa jartzen!
|
