Platform Screen Door Retrofit Scheme of Shanghai Rail Transit Line 2 in Coordination with Signaling System Upgrade
ObjectiveShanghai Rail Transit Line 2 (hereinafter referred to as 'Line 2') adopts TBTC (track circuit-based train control) signaling mode during its construction period. After the line entered the stage for major signaling system overhaul, the signaling system is upgraded to 'TBTC+CBTC (communicati...
Gespeichert in:
| Hauptverfasser: | , , , |
|---|---|
| Format: | Artigo |
| Sprache: | Chinês |
| Veröffentlicht: |
Urban Mass Transit Magazine Press
2026-07-01
|
| Schriftenreihe: | Chengshi guidao jiaotong yanjiu |
| Schlagworte: | |
| Online-Zugang: | https://doi.org/10.16037/j.1007-869x.20240527?pageType=en |
| Tags: |
Keine Tags, Fügen Sie das erste Tag hinzu!
|
