Asymmetric Loss Functions for Contract Capacity Optimization
For high-voltage and extra-high-voltage consumers, the electricity cost depends not only on the power consumed but also on the contract capacity. For the same amount of power consumed, the smaller the difference between the contract capacity and the power consumed, the smaller the electricity cost....
Сохранить в:
| Главные авторы: | , , , , |
|---|---|
| Формат: | Artigo |
| Язык: | Inglês |
| Опубликовано: |
MDPI AG
2020-06-01
|
| Серии: | Energies |
| Предметы: | |
| Online-ссылка: | https://www.mdpi.com/1996-1073/13/12/3123 |
| Метки: |
Нет меток, Требуется 1-ая метка записи!
|
