QR Kod

Probabilistic Short-Term Load Forecasting Incorporating Behind-the-Meter (BTM) Photovoltaic (PV) Generation and Battery Energy Storage Systems (BESSs)

Increased behind-the-meter (BTM) solar generation causes additional errors in short-term load forecasting. To ensure power grid reliability, it is necessary to consider the influence of the behind-the-meter distributed resources. This study proposes a method to estimate the size of behind-the-meter...

Ful tanımlama

Kaydedildi:
Detaylı Bibliyografya
Asıl Yazarlar: Ji-Won Cha, Sung-Kwan Joo
Materyal Türü: Artigo
Dil:Inglês
Baskı/Yayın Bilgisi: MDPI AG 2021-10-01
Seri Bilgileri:Energies
Konular:
Online Erişim:https://www.mdpi.com/1996-1073/14/21/7067
Etiketler: Etiketle
Etiket eklenmemiş, İlk siz ekleyin!