Optimal operating scenario for Polerood hydropower station to maximize peak shaving and produced profit
This paper deals with the optimization of the daily operation of Polerood hydropower station being constructed in the north of Iran. Dynamic Programming method (DP) is applied as the preferred optimization tool owing to the fact that it guarantees the optimal solution and is applicable to the presen...