QR-koodi

Finite Capacity Scheduling of Make-Pack Production: Case Study of Adhesive Factory

This paper developed a Finite Capacity Scheduling (FCS) system for make-pack production based on a real case of an adhesive factory. The FCS determines production quantity of each machine to conform with resource capacities and due date of customer orders while minimizes related total cost. The tota...

Täydet tiedot

Tallennettuna:
Bibliografiset tiedot
Päätekijät: Chotpradit, T., Yenradee, P.
Aineistotyyppi: Artigo
Kieli:Inglês
Julkaistu: Engineering, Project, and Production Management (EPPM) 2014-07-01
Sarja:Journal of Engineering, Project, and Production Management
Aiheet:
Linkit:http://www.ppml.url.tw/EPPM_Journal/volumns/04_02_July_2014/ID_091_4_2_114_123.pdf
Tagit: Lisää tagi
Ei tageja, Lisää ensimmäinen tagi!