Costs of upgrading based on 131 railway line
In searching for the optimal use of the railway company's financial resources (PKP PLK) and the time of planning the repairs of the tracks, a track durability model was created. The model in its assumptions is based on the technical and operational parameters of the railway line No. 131. The article...
Gespeichert in:
| Hauptverfasser: | , |
|---|---|
| Format: | Artigo |
| Sprache: | Inglês |
| Veröffentlicht: |
Łukasiewicz Research Network - Poznań Institute of Technology
2018-02-01
|
| Schriftenreihe: | Pojazdy Szynowe |
| Schlagworte: | |
| Online-Zugang: | https://www.railvehicles.eu/Costs-of-upgrading-based-on-131-railway-line,138474,0,2.html |
| Tags: |
Keine Tags, Fügen Sie das erste Tag hinzu!
|
