Código QR (código de barras bidimensional)

A branch-and-bound algorithm to minimize total tardiness in a two-machine flowshop problem with different release time

In this study, we consider the scheduling problem for two-machine flowshops with jobs of the different release times. In many real situations, jobs can be arrived at different times due to progress of jobs in the preceding stage or the status of supply of raw materials. We set the objective function...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Principais autores: June-Young BANG, BongJoo JEONG
Formato: Artigo
Idioma:Inglês
Publicado em: The Japan Society of Mechanical Engineers 2019-11-01
coleção:Journal of Advanced Mechanical Design, Systems, and Manufacturing
Assuntos:
Acesso em linha:https://www.jstage.jst.go.jp/article/jamdsm/13/4/13_2019jamdsm0080/_pdf/-char/en
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!