Research on the pressure relief mechanism and application of roof dense drilling of gob side entry retaining by roadway-side filling
Abstract In gob-side entry retaining (GER) by roadway-side filling, the long cantilever beam structure formed by the goaf roof subjects the filling wall to significant compressive stress under its self-weight and overburden load, often resulting in severe deformations such as floor heave. The S1212...
Gespeichert in:
| Hauptverfasser: | , , , , , , , |
|---|---|
| Format: | Artigo |
| Sprache: | Inglês |
| Veröffentlicht: |
Nature Portfolio
2026-02-01
|
| Schriftenreihe: | Scientific Reports |
| Schlagworte: | |
| Online-Zugang: | https://doi.org/10.1038/s41598-025-32678-4 |
| Tags: |
Keine Tags, Fügen Sie das erste Tag hinzu!
|
