Safe vibration velocity of directly buried pressure pipeline under blasting P wave
With the continuous development of urban underground space in China, safety problems between urban underground pipelines and underground engineering construction that are in active service are constantly emerging. As an important way of excavating engineering rock and soil mass, blasting has a parti...
Na minha lista:
| Principais autores: | , , , , |
|---|---|
| Formato: | Artigo |
| Idioma: | Chinês |
| Publicado em: |
Science Press
2022-08-01
|
| Colecção: | 工程科学学报 |
| Assuntos: | |
| Acesso em linha: | http://cje.ustb.edu.cn/article/doi/10.13374/j.issn2095-9389.2021.01.10.001 |
| Tags: |
Sem tags, seja o primeiro a adicionar uma tag!
|
