QR-koodi

Multi-Objective Optimization of Tasks Scheduling Problem for Overlapping Multiple Tower Cranes

The scheduling of tower crane operations is a complex process. Overlapping areas between tower cranes often lead to increased collision possibilities, resulting in additional tower crane operation complexity. Single objectives related to time or economic aspects were always considered in dealing wit...

Täydet tiedot

Tallennettuna:
Bibliografiset tiedot
Päätekijät: Yanyan Wang, Wenjie Zhao, Wenjing Cui, Guangqiang Zhou
Aineistotyyppi: Artigo
Kieli:Inglês
Julkaistu: MDPI AG 2024-03-01
Sarja:Buildings
Aiheet:
Linkit:https://www.mdpi.com/2075-5309/14/4/867
Tagit: Lisää tagi
Ei tageja, Lisää ensimmäinen tagi!