Multi-Objective Optimization of Tasks Scheduling Problem for Overlapping Multiple Tower Cranes
The scheduling of tower crane operations is a complex process. Overlapping areas between tower cranes often lead to increased collision possibilities, resulting in additional tower crane operation complexity. Single objectives related to time or economic aspects were always considered in dealing wit...
Tallennettuna:
| Päätekijät: | , , , |
|---|---|
| Aineistotyyppi: | Artigo |
| Kieli: | Inglês |
| Julkaistu: |
MDPI AG
2024-03-01
|
| Sarja: | Buildings |
| Aiheet: | |
| Linkit: | https://www.mdpi.com/2075-5309/14/4/867 |
| Tagit: |
Ei tageja, Lisää ensimmäinen tagi!
|
