Late Acceptance Hill-Climbing Matheuristic for the General Lot Sizing and Scheduling Problem with Rich Constraints
This paper considers the general lot sizing and scheduling problem with rich constraints exemplified by means of rework and lifetime constraints for defective items (GLSP-RP), which finds numerous applications in industrial settings, for example, the food processing industry and the pharmaceutical i...
保存先:
| 主要な著者: | , , |
|---|---|
| フォーマット: | Artigo |
| 言語: | Inglês |
| 出版事項: |
MDPI AG
2020-06-01
|
| シリーズ: | Algorithms |
| 主題: | |
| オンライン・アクセス: | https://www.mdpi.com/1999-4893/13/6/138 |
| タグ: |
タグなし, このレコードへの初めてのタグを付けませんか!
|
