QR-koodi

Research Status on AC Stray - Current Interference of Buried Steel Pipeline

With the rapid development of the energy, power distribution transmission and electrified rail transit systems of our country, the stray - current interference problem caused by the crossing and paralleling of buried steel pipelines and by the close laying distance has caught the attention of safety...

Täydet tiedot

Tallennettuna:
Bibliografiset tiedot
Päätekijä: LI Xiao - long, WANG Zheng - xiao, LUO Yan - long, LI Chang - chun, HE Ren - yang
Aineistotyyppi: Artigo
Kieli:Chinês
Julkaistu: Editorial Department of Materials Protection 2022-08-01
Sarja:Cailiao Baohu
Aiheet:
Linkit:http://www.mat-pro.com/fileup/1001-1560/PDF/20220824.pdf
Tagit: Lisää tagi
Ei tageja, Lisää ensimmäinen tagi!