Single-Machine Rescheduling with Rejection and an Operator No-Availability Period
In this paper, we investigate a rescheduling problem with rejection and an operator non-availability period on a single machine. An optimal original schedule with the objective of minimizing the total weighted completion time has been made in a deterministic production scheduling system without an u...
I tiakina i:
| Ngā kaituhi matua: | , |
|---|---|
| Hōputu: | Artigo |
| Reo: | Inglês |
| I whakaputaina: |
MDPI AG
2024-11-01
|
| Rangatū: | Mathematics |
| Ngā marau: | |
| Urunga tuihono: | https://www.mdpi.com/2227-7390/12/23/3678 |
| Ngā Tūtohu: |
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!
|
