क्यूआर कोड

A Case Study of Incorporating Variable Recovery and Specific Energy in Long-Term Open Pit Mining

Integrated Optimization can find optimized solutions for a project to define open pit and mine scheduling with greater reliability. This work aims to demonstrate how the insertion of geometallurgical variables can significantly change the financial return of a project. Two geometallurgical variables...

पूर्ण विवरण

में बचाया:
ग्रंथसूची विवरण
मुख्य लेखकों: Jônatas Franco Campos da Mata, Alizeibek Saleimen Nader, Douglas Batista Mazzinghy
स्वरूप: Artigo
भाषा:Inglês
प्रकाशित: MDPI AG 2023-06-01
श्रृंखला:Mining
विषय:
ऑनलाइन पहुंच:https://www.mdpi.com/2673-6489/3/2/22
टैग: टैग जोड़ें
कोई टैग नहीं, इस रिकॉर्ड को टैग करने वाले पहले व्यक्ति बनें!