Código QR

Scheduling Bi-Objective Lot-Streaming Hybrid Flow Shops with Consistent Sublots via an Enhanced Artificial Bee Colony Algorithm

This work addresses bi-objective hybrid flow shop scheduling problems considering consistent sublots (Bi-HFSP_CS). The objectives are to minimize the makespan and total energy consumption. First, the Bi-HFSP_CS is formalized, followed by the establishment of a mathematical model. Second, enhanced ve...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Principais autores: Benxue Lu, Kaizhou Gao, Peiyong Duan, Adam Slowik
Formato: Artigo
Idioma:Inglês
Publicado em: Tsinghua University Press 2025-03-01
Colecção:Complex System Modeling and Simulation
Assuntos:
Acesso em linha:https://www.sciopen.com/article/10.23919/CSMS.2024.0022
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!