Considering the Switching Strategy of the Transmitting Wind Power to Deal with the DC Blocking Fault Under the Constraint of Transient Overvoltage
[Objective] For the power grid with high penetration of new energy,measures such as rapid shut-off or emergency reduction of the power of new energy stations are often used to deal with DC lockout faults,but the cutting will weaken the strength of the system,which will worsen the transient overvolta...
保存先:
| 第一著者: | |
|---|---|
| フォーマット: | Artigo |
| 言語: | Chinês |
| 出版事項: |
Editorial Department of Electric Power Construction
2025-12-01
|
| シリーズ: | Dianli jianshe |
| 主題: | |
| オンライン・アクセス: | https://www.cepc.com.cn/fileup/1000-7229/PDF/1764752280630-939397243.pdf |
| タグ: |
タグなし, このレコードへの初めてのタグを付けませんか!
|
