Sotka Dam Seepage; Evaluation and Possible Remediation
One of the most important analysis that should be done before the construction of an embankment dam is the seepage analysis. Inaccurate analysis of the seepage through the foundation or the dam body will lead to inaccurate design of the seepage control measures, and consequently may cause failure of...
Guardat en:
| Autors principals: | , , |
|---|---|
| Format: | Artigo |
| Idioma: | Árabe |
| Publicat: |
University of Sulaimania
2016-04-01
|
| Col·lecció: | Sulaimani Journal for Engineering Sciences |
| Matèries: | |
| Accés en línia: | https://sites.google.com/a/univsul.edu.iq/sjes/issues/sjec-volume-3-no-3-2016-english-part/sjes-10038 |
| Etiquetes: |
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
|
