QR code

Surveying Dewatered Areas in the Fish Spawning Sites during Short-Term Drawdown Operations: Case Study of a Large Hydropower Plant Reservoir in the Lowland Area, Lithuania

This paper presents research on the dewatering areas during drawdown operations in the Kaunas Hydropower Plant (HPP) reservoir situated in the lowland area of Lithuania. It is a multipurpose reservoir primarily used for power generation by two large hydropower plants. Because of the HPP peaking oper...

Volledige beschrijving

Bewaard in:
Bibliografische gegevens
Hoofdauteurs: Linas Jurevičius, Petras Punys, Egidijus Kasiulis, Linas Šilinis
Formaat: Artigo
Taal:Inglês
Gepubliceerd in: MDPI AG 2022-11-01
Reeks:Energies
Onderwerpen:
Online toegang:https://www.mdpi.com/1996-1073/15/22/8574
Tags: Voeg label toe
Geen labels, Wees de eerste die dit record labelt!