QR koda

Beyond Kanban: POLCA-Constrained Scheduling for Job Shops

This study investigates the integration of finite capacity scheduling with POLCA-based workload control in high-mix, low-volume production environments. We propose a proactive scheduling approach that embeds POLCA constraints into a constraint programming (CP) model, aiming to reconcile the trade-of...

Popoln opis

Shranjeno v:
Bibliografske podrobnosti
Principais autores: Antonio Grieco, Pierpaolo Caricato, Paolo Margiotta
Format: Artigo
Jezik:Inglês
Izdano: MDPI AG 2025-06-01
Serija:Algorithms
Teme:
Online dostop:https://www.mdpi.com/1999-4893/18/6/340
Oznake: Označite
Brez oznak, prvi označite!