QR-Code

In vessel characterization and first power tests on plasma of the Real-Time controllable EC launcher on FTU Tokamak

The Electron Cyclotron (EC) fast launcher for real time control experiments has been installed on FTU and characterized to be fully integrated in a real-time MHD control module under development. The launcher scheme is based on a two module system, symmetric with respect to the equatorial plane of F...

Ausführliche Beschreibung

Gespeichert in:
Bibliografische Detailangaben
Hauptverfasser: Nardone A., Muzzini V., Minelli D., Mellera V., Grosso G., Granucci G., Garavaglia S., Galperti C., Figini L., Ferrero R., Farina D., Davoudi M., D’Arcangelo O., D’Antona G., Cirant S., Bruschi A., Boncagni L., Bin W., Artaserse G., Alessi E., Moro A., Nowak S., Ramogida G., Simonetto A., Sozzi C.
Format: Artigo
Sprache:Inglês
Veröffentlicht: EDP Sciences 2012-09-01
Schriftenreihe:EPJ Web of Conferences
Online-Zugang:http://dx.doi.org/10.1051/epjconf/20123202018
Tags: Tag hinzufügen
Keine Tags, Fügen Sie das erste Tag hinzu!