Comparative Study on Pouring Timing of Sealing Hinge Concrete for Concrete-Filled Steel Tube Arch Bridge
The pouring timing of sealing hinge concrete for concrete-filled steel tube arch bridges directly affects the construction duration and the stress state of arch ribs. To clarify the structural response differences at different pouring timings, the Beiliuhe Extra-large Bridge on the Pingxi‒Cenxi Expr...
Zapisane w:
| Główni autorzy: | , , , , |
|---|---|
| Format: | Artigo |
| Język: | Chinês |
| Wydane: |
Editorial Office of Journal of China & Foreign Highway
2026-06-01
|
| Seria: | Zhongwai Gonglu |
| Hasła przedmiotowe: | |
| Dostęp online: | https://zwgl.csust.edu.cn/zwgl/article/html/202603018?st=article_issue |
| Etykiety: |
Nie ma etykietki, Dołącz pierwszą etykiete!
|
