Código QR (código de barras bidimensional)

Integrated management model of production and yard stock for in-situ precast concrete production

In-situ production of precast concrete (PC) members is affected by various factors, such as cost, time, quantity, lead-time, number of molds, production cycle, number of cranes, and yard stock area. Particularly, the yard stock area constitutes over 84% of the total required area, considerably large...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Principais autores: Jeeyoung Lim, Dae Young Kim
Formato: Artigo
Idioma:Inglês
Publicado em: Taylor & Francis Group 2023-01-01
coleção:Journal of Asian Architecture and Building Engineering
Assuntos:
Acesso em linha:http://dx.doi.org/10.1080/13467581.2021.2007111
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!