Discrete-Element Analysis of the Excavation Performance of an EPB Shield TBM under Different Operating Conditions
This study used a discrete-element analysis to predict the excavation performance of a 7.73 m-diameter earth pressure balance (EPB) shield tunnel boring machine (TBM). The simulation mainly predicted several excavation performance indicators for the machine, under different operating conditions. The...
I tiakina i:
| Ngā kaituhi matua: | , , , , |
|---|---|
| Hōputu: | Artigo |
| Reo: | Inglês |
| I whakaputaina: |
MDPI AG
2021-05-01
|
| Rangatū: | Applied Sciences |
| Ngā marau: | |
| Urunga tuihono: | https://www.mdpi.com/2076-3417/11/11/5119 |
| Ngā Tūtohu: |
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!
|
