QR Code

Discrete-Element Analysis of the Excavation Performance of an EPB Shield TBM under Different Operating Conditions

This study used a discrete-element analysis to predict the excavation performance of a 7.73 m-diameter earth pressure balance (EPB) shield tunnel boring machine (TBM). The simulation mainly predicted several excavation performance indicators for the machine, under different operating conditions. The...

Whakaahuatanga katoa

I tiakina i:
Ngā taipitopito rārangi puna kōrero
Ngā kaituhi matua: Byungkwan Park, Chulho Lee, Soon-Wook Choi, Tae-Ho Kang, Soo-Ho Chang
Hōputu: Artigo
Reo:Inglês
I whakaputaina: MDPI AG 2021-05-01
Rangatū:Applied Sciences
Ngā marau:
Urunga tuihono:https://www.mdpi.com/2076-3417/11/11/5119
Ngā Tūtohu: Tāpirihia he Tūtohu
Kāore He Tūtohu, Me noho koe te mea tuatahi ki te tūtohu i tēnei pūkete!