Synchronizing production of precast elements with on-site erection

Offsite construction technologies are developed to reduce project cost and duration. To make the most of the potential offered by prefabrication the planner should consider the whole supply chain. A failure to coordinate the off-site production with on-site erection is a source of waste (waiting tim...