An Effective Discrete Jaya Algorithm for Multi-AGVs Scheduling Problem With Dynamic Unloading Time
With the advance of Automated Guided Vehicles (AGVs) technology, the scheduling of multiple AGVs in a matrix manufacturing workshop has attracted considerable attention. However, little attention has been devoted to dynamic unloading time for multiple AGVs scheduling. This paper investigates a new m...
محفوظ في:
| المؤلفون الرئيسيون: | , , , , , |
|---|---|
| التنسيق: | Artigo |
| اللغة: | Inglês |
| منشور في: |
IEEE
2024-01-01
|
| سلاسل: | IEEE Access |
| الموضوعات: | |
| الوصول للمادة أونلاين: | https://ieeexplore.ieee.org/document/10606498/ |
| الوسوم: |
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
