MAIN ENGINE SELECTION OPTIMIZATION ANALYSIS OF THE SHIP CARAKA JAYA III BASED ON ENGINEERING AND ECONOMY COSIDERATIONS
<p>Caraka Jaya III, as sister ships, built in Indonesia in the era 1990, devided into three building phases. Each phase had the different main engine. Especially for the second phase used the MAN B&W 5S26MC as main engine. After several years later, some of the engines were going to have the pr...
Spremljeno u:
| Glavni autor: | |
|---|---|
| Format: | Artigo |
| Jezik: | Inglês |
| Izdano: |
Department of Naval Architecture, Faculty Engineering, Diponegoro University
2013-06-01
|
| Serija: | Kapal |
| Teme: | |
| Online pristup: | http://ejournal.undip.ac.id/index.php/kapal/article/view/5120 |
| Oznake: |
Bez oznaka, Budi prvi tko označuje ovaj zapis!
|
