Código QR

A study of the multi-strategy improved dung beetle algorithm and its application to shop floor scheduling problems

This paper addresses the Distributed Flexible Job Shop Scheduling Problem (DFJSPT) considering transportation time, a complex NP-hard optimization challenge where traditional metaheuristics often suffer from slow convergence and premature stagnation. A novel Multi-Strategy Enhanced Dung Beetle Optim...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Principais autores: Wanjiang Wang, Feng Zhao, Wei Jian, Huihui Gao, Qi Sun, Mingjun Wang, Renwang Li, Xing Li, Xiaxia Gao
Formato: Artigo
Idioma:Inglês
Publicado em: Elsevier 2026-06-01
Colecção:Systems and Soft Computing
Assuntos:
Acesso em linha:http://www.sciencedirect.com/science/article/pii/S277294192600075X
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!