QR kód

Analyzing sedimentation patterns in the Naumure Multipurpose Project (NMP) reservoir using 1D HEC-RAS modeling

Abstract Naumure Multipurpose Project (NMP) featuring a 169 m high Concrete Face Rock Filled Dam (CFRD) is the proposed reservoir project in the West Rapti River with an installed capacity of 218.34 MW. Most of the rivers in Nepal carry significant sediment loads that will consequently catalyze rese...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autoři: Vishan Dahal, Subash Kunwar, Shishir Bhandari, Subash Chaudhary, Saurab Gautam, Nabin Bhatt, Ram Krishna Regmi
Médium: Artigo
Jazyk:Inglês
Vydáno: Nature Portfolio 2024-09-01
Edice:Scientific Reports
Témata:
On-line přístup:https://doi.org/10.1038/s41598-024-73883-x
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo vytvoří štítek k tomuto záznamu!