Código QR (código de barras bidimensional)

Grey prediction analysis of cutoff wall affected by construction effect

The long-term stability analysis of cutoff wall affected by construction effect is crucial. The longterm stability of the cutoff wall of Daning Reservoir is mainly affected by the combined action of highway vehicle load, extreme highway load and water load under different water storage loads. In thi...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Principais autores: Yuan Hong-Hu, Yao Dai, Yu Wang
Formato: Artigo
Idioma:Inglês
Publicado em: EDP Sciences 2021-01-01
coleção:E3S Web of Conferences
Acesso em linha:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/69/e3sconf_gceece2021_02054.pdf
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!