Deck Slab Elements for the Accelerated Construction of Steel–Concrete Composite Bridges

Various methods have been developed to produce deck slabs for steel–concrete composite bridges. Usually, the deck slabs are cast with in situ concrete using a formwork carriage, resulting in construction progress of 15 to 25 m of deck slab per week. A new construction method was developed at the Ins...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autoři: Franz Untermarzoner, Johann Kollegger, Michael Rath, Kerstin Gaßner, Tobias Huber
Médium: Artigo
Jazyk:Inglês
Vydáno: MDPI AG 2023-07-01
Edice:Applied Sciences
Témata:
On-line přístup:https://www.mdpi.com/2076-3417/13/13/7825