Construction Technology for Ultra-wide Excavation near Existing Buildings in Metro Station Shield Tunneling Receiving Area
Objective It is aimed to address the difficulty in settlement control of existing ground buildings during ultra-large section excavation beneath them in metro station construction. Method Based on the shield tunneling receiving area project of newly built Chengdu Metro Line 18 Nijiaqiao Station, whi...
Furkejuvvon:
| Váldodahkki: | |
|---|---|
| Materiálatiipa: | Artigo |
| Giella: | Chinês |
| Almmustuhtton: |
Urban Mass Transit Magazine Press
2024-08-01
|
| Ráidu: | Chengshi guidao jiaotong yanjiu |
| Fáttát: | |
| Liŋkkat: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.08.026.html |
| Fáddágilkorat: |
Eai fáddágilkorat, Lasit vuosttaš fáddágilkora!
|
