Two-objective optimization of preventive maintenance orders scheduling as a multi-skilled resource-constrained flow shop problem
In this article, the application of the Multi-Skilled Resource-Constrained Flow Shop Scheduling Problem (MSRC-FSSP) in preventive maintenance as a case study has been investigated. In other words, to complete each maintenance order at each stage, in addition to the machine, a set of require...
محفوظ في:
| المؤلفون الرئيسيون: | , , |
|---|---|
| التنسيق: | Artigo |
| اللغة: | Inglês |
| منشور في: |
Growing Science
2023-01-01
|
| سلاسل: | Decision Science Letters |
| الوصول للمادة أونلاين: | http://www.growingscience.com/dsl/Vol12/dsl_2022_42.pdf |
| الوسوم: |
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
