Minimizing makespan for mixed batch scheduling with identical machines and unequal ready times
Abstract This study addresses the problem of minimizing the makespan for scheduling parallel batch machines, where jobs are processed in batches and each machine has the same capacity. The processing time for each batch includes setup, preheating, and heat preservation stages, introducing both seria...
Sábháilte in:
| Príomhchruthaitheoir: | |
|---|---|
| Formáid: | Artigo |
| Teanga: | Inglês |
| Foilsithe / Cruthaithe: |
Nature Portfolio
2025-02-01
|
| Sraith: | Scientific Reports |
| Ábhair: | |
| Rochtain ar líne: | https://doi.org/10.1038/s41598-025-89698-3 |
| Clibeanna: |
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|
