QR Code

ITER NBI operational window and power availability constraints due to shine-through losses

This paper explores the operational boundaries and power availability of the neutral beam injection (NBI) system in ITER, with a specific focus on shine-through (ST) loss prevention. ST, a phenomenon where part of the injected neutral beam remains un-ionized in the plasma and directly impacts the fi...

Description complète

Enregistré dans:
Détails bibliographiques
Auteurs principaux: P. Vincenzi, M. Schneider, P. Veltri, J.F. Artaud, A. Loarte, S. Nicolici, C. Poggi, A.R. Polevoi, A. Snicker
Format: Artigo
Langue:Inglês
Publié: IOP Publishing 2025-01-01
Collection:Nuclear Fusion
Sujets:
Accès en ligne:https://doi.org/10.1088/1741-4326/adaf41
Tags: Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!