Project management with dynamic scheduling baseline scheduling, risk analysis and project control /
The topic of this book is known as dynamic scheduling, and is used to refer to three dimensions of project management and scheduling: the construction of a baseline schedule and the analysis of a project schedule’s risk as preparation of the project control phase during project progress. This dynami...
Na minha lista:
主要作者: | |
---|---|
格式: | Livro |
語言: | Inglês |
出版: |
Springer,
c201
|
主題: | |
在線閱讀: | https://minerva.ufrj.br/F/?func=direct&doc_number=000908866&local_base=UFR01 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|