Reconstruction of the Mine Plan in Szklary (Poland) Using ERT

– The final result of the project is to create a 2D model of the mine plan based on the results of the geophysical measurements.– ERT was chosen as the primary method in this project due to the fact that the voids and the air have a very high resistivity (3,3 ∙ 1016Ωm). Voids are very well recogniza...