4.2. The excavation of Zone 3
The 2011 four week campaign conducted in Zone 3 focused on the western part of Building CD (Rooms 3.4, 3.5, 3.6, and 3.11). Room 3.8 and the two compartments 3.9 and 3.10 were also intensively cleaned and the tumble blocking the opening between Room 3.1 and Room 4.11 was removed, without, however, r...
Збережено в:
| Автор: | |
|---|---|
| Формат: | Chapter |
| Мова: | Inglês |
| Опубліковано: |
Presses universitaires de Louvain
2012
|
| Онлайн доступ: | https://hdl.handle.net/20.500.13089/54l2 https://books.openedition.org/pucl/2898 |
| Теги: |
Немає тегів, Будьте першим, хто поставить тег для цього запису!
|
