Zhang, H., Wu, S., & Maloney, L. T. (2010). Planning multiple movements within a fixed time limit: The cost of constrained time allocation in a visuo-motor task. J Vis.
استشهاد بنمط شيكاغوZhang, Hang, Shih-Wei Wu, و Laurence T. Maloney. "Planning Multiple Movements Within a Fixed Time Limit: The Cost of Constrained Time Allocation in a Visuo-motor Task." J Vis 2010.
MLA استشهادZhang, Hang, Shih-Wei Wu, و Laurence T. Maloney. "Planning Multiple Movements Within a Fixed Time Limit: The Cost of Constrained Time Allocation in a Visuo-motor Task." J Vis 2010.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.