Claire, J., H, S. T., R, B. G., J, A. A., Michael, D., & R, M. K. (2008). Do estimates of cost-utility based on the EQ-5D differ from those based on the mapping of utility scores? BMC.
استشهاد بنمط شيكاغوClaire, Jenkinson, Sach Tracey H, Barton Garry R, Avery Anthony J, Doherty Michael, و Muir Kenneth R. Do Estimates of Cost-utility Based On the EQ-5D Differ From Those Based On the Mapping of Utility Scores? BMC, 2008.
MLA استشهادClaire, Jenkinson, et al. Do Estimates of Cost-utility Based On the EQ-5D Differ From Those Based On the Mapping of Utility Scores? BMC, 2008.
تحذير: قد لا تكون هذه الاستشهادات دائما دقيقة بنسبة 100%.