Alıntılar

APA (7. basım) Alıntı
Thangaraj, M., Kumar, T. J., & Nandan, K. (2022). A precedence constrained flow shop scheduling problem with transportation time, breakdown times, and weighted jobs. Growing Science.
Chicago Style (17. basım) Atıf
Thangaraj, M., T. Jayanth Kumar, ve KR Nandan. A Precedence Constrained Flow Shop Scheduling Problem with Transportation Time, Breakdown Times, and Weighted Jobs. Growing Science, 2022.
MLA (9th ed.) Atıf
Thangaraj, M., et al. A Precedence Constrained Flow Shop Scheduling Problem with Transportation Time, Breakdown Times, and Weighted Jobs. Growing Science, 2022.
Uyarı: Bu alıntı herzaman %100 doğru olmayabilir..